- Beautiful rear side of the detached house single-story pitch roof open plan extension.
- Vaulted ceiling with large skylight installations.
- Smart underfloor heating system installations.
- Bi-folding doors in the rear and side of the extension.
- Beautiful kitchen installations.
- Start to completion duration 12 weeks and 3 days.